Industry & Energy Techical Projects | 210 6619 590 | info@bienter.gr

heliosphera f Short Description
CUSTOMER: HELIOSPHERA
PROJECT: ELECTROMECHANICAL INSTALLATIONS OF THE NEW P/V MODULES MANUFACTURING PLANT
LOCATION: INDUSTRIAL AREA OF TRIPOLI, ARKADIA

 

Description
Electromechanical Installations of the new P/V modules manufacturing plant
- Project Completion: 2010
   Services:   Production:
  • Installation of stainless steel piping for compressed dry air (CDA) distribution network
  • Installation of stainless steel piping for process cooling water (PCW) distribution network for all the production line equipment of the factory
  • Installation of stainless steel piping industrial deionized water (DIW) for distribution network
  • Installation of fire detection system for the whole plant
  • Installation of all interior and exterior lighting
  • Electrical Installation for the production equipment
  • Installation of LPG detection system (Liquified Petroleum Gas)
  • Installation of piping for nitrogen supply to certain production equipment
  • Piping insulations for the fire protection network at the Gas Farm section.
  • The factory is one of the most modern plants in thin-film photovoltaic (Micromorph Thin Film) in the world and with an annual production capacity of 60MWp, the largest in Europe
  • Fully automated production system in a facility of 27,000m², with a clean room over 1500 m² (one of the largest in Europe)