Short Description OWNER: SHPP PELOPONISSOU S.A. PROJECT: CONSTRUCTION OF 1.95MWe SMALL HYDROELECTRIC POWER PLANT LOCATION: PETSAKOI DROSATO, ACHAIA PREFECTURE, GREECE |
|
Description: |
Services: |
Small HydroElectric Power Plant – 1.95MWe - Plant production start: pending |
- Feasibility – Financial Studies
- Design – Licensing
- Selection and procurement of electrical production electromechanical equipment
- Project Management
|
Scope of work: |
Technical Data: |
- TURN KEY construction
- Intake: Civil works, equipment procurement/construction of electromechanical installations
- Penstock: Complete installation of GRP penstock, manufacturing of special parts
- Power House: Civil works, installation of electrical production equipment, manufacturing of penstock special parts and parts of electromechanical equipment
|
- Two (2) vertical axis Pelton turbines, with five (5) noozles, manufactured by Geppert (Austria), 1080kW output each
- Two (2) synchronous generators, 600V, 50Hz, 3-phase, 1200kVA output each
- Steel Penstock, length 2650m, diameter: DN1100
|
BIENTER S.A. shareholders’ project