Short Description OWNER: ARGYRI ENERGEIAKI S.A. PROJECT: CONSTRUCTION OF 6.35MWe SMALL HYDROELECTRIC POWER PLANT LOCATION: ARGYRI, KARDITSA PREFECTURE, GREECE |
|
Description: |
Services: |
Small HydroElectric Power Plant – 6.35MWe - Plant production start: 2008 |
- Feasibility – Financial Studies
- Design – Licensing
- Selection and procurement of electrical production electromechanical equipment
- Project Management
|
Scope of work: |
Technical Data: |
- TURN KEY construction
- Intake: Civil works, equipment procurement/construction of electromechanical installations
- Penstock: Complete installation of GRP penstock, manufacturing of special parts
- Power House: Civil works, installation of electrical production equipment, manufacturing of penstock special parts and parts of electromechanical equipment
|
- Vertical axis Pelton turbine, with six (6) noozles, manufactured by VATECH (Austria), 6904kW output
- Synchronous generator, 6.3kV, 50Hz, 3-phase, 7900kVA output
- Steel Penstock, length 1800m, diameter: DN1100
|
BIENTER S.A. shareholders’ project